MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy., This news data comes from:http://pde.705-888.com
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
ERC amends net-metering rules to expand renewable energy options
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
ERC amends net-metering rules to expand renewable energy options
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.

In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- Marcos to attend UN meet in New York in Sept- Palace
- Former president Duterte's health stable despite high blood sugar, says VP Sara
- 9 dead in Ecuador after bus plunges into ravine
- 2 Marikina policemen accused of molestation
- Lawyer seeks Duterte's return to Philippines, cites 'deteriorating health'
- Drug war whistleblower Royina Garma returns to PH after US detention
- Duterte lawyer cites former president's failing health, urges return to PH after ICC postpones hearing
- Pagasa: Rainy Monday over Visayas, Luzon areas due to LPA, 'habagat'
- Head of main US health agency abruptly dismissed
- LTO told to summon 2 DPWH engineers with fake driver’s license